Topic
[KB1205]Migrating a PcVue project containing LON communication
Tags:
LNS,
Migration
| Applies to:
PcVue 15 onwards |
|
| Summary:
Prerequisites for migrating a PcVue project containing LON communication. |
|
| Details:
Prerequisites to take into account:
- – Plan for updating the LON license (LON server + Commissioning Tool). It is mandatory to use the same LON software suite (Server + CT*) as before the update.
- – Operating System Compatibility: Check the compatibility with the operating systems supported by PcVue and the LON server (refer to article KB1106).
- – Use a version of Izot Net Server that is compatible with PcVue (refer to article KB1106).
- – Migrate the LON database using LON-specific software.
- – After the migration, perform tests on PcVue. Consider reading other KB articles for optimization (see article KB781).
- – Check if the activeX “Stibill” is used, if it is used you need to install this activeX on the new machine and test it
*CT: Commissioning Tool |
|
|
|
Created on: 21 Mar 2024
Last update: 11 Dec 2024